Step 1:
Lay Out Pool (1) |
|
Step 2:
Dig Pool |
|
 |
|
 |
|
Step 3:
Steel the Pool |
|
After this
step is completed, we schedule inspections before going to the next step.
|
 |
|
 |
|
Step 4 :
Shotcrete Pool (1) |
|
Shotcrete Pool (2) |
 |
|
 |
|
Step 5:
Pool Backfill
|
|
After this
step is completed, job will be ready for
Brick & Tile
installation. |
|
 |
|
 |
|
Step 6:
Brick & Tile Installation
|
|
After this
step is completed, job will be ready for
Plumbing.
|
 |
|
|
|
Step 7:
Plumbing Installation |
|
After the plumbing is completed, we schedule inspection before going to the next steps:
Rough Electrical and Deck Grade. |
|
 |
|
|
|
Step 8:
Form the deck |
|
After the Rough Electric is done,
all pipes will be covered, then, the deck will be formed ,and inspections
will be scheduled.
After the
inspections passed, the concrete will be poured and the topping done.
|
 |
|
|
|
Coming Soon!
Step 9:
Concrete to be poured.
|
|
|
|
Step10:
Finish the Deck with Topping - "Cool Deck
Topping" |
|
"Euro-Tile Topping" |
|
 |
|
 |
|
Florida Stones |
|
"Paver
Topping" |
 |
|
 |
|
"Paver
Topping" |
|
"Marble
over sand" |
 |
|
 |
|
Step 11:
Equipment installation (Pump, Filter, Heater, Salt Chlorinator)
|
|
After this
step is completed, the electrician will be scheduled to do the Final
Electrical Hook-up.
After the
electrical work is completed, we schedule an Electrical Inspection if
required to be done before pool is completed.
Some Cities and/or Counties require this inspection
to be done after the pool is finish and the pool equipment is running. |
|
 |
|
|
|
Step 12: Pool Barrier
- Screen Enclosure |
|
|
|
 |
|
After the installation is
completed is
completed, the Screen Company schedule inspections. |
|
Step 13:
Pool Plaster Preparation |
|
Step 14:
Final Clean up and Grade |
|
Coming Soon! |
|
Coming Soon! |
|
Step 15: Pool Barrier
|
|
|
|
New Yard Fence Installation
- Coming Soon!
After this step is
completed, the Fence Company schedule inspections.
|
|
NOTE: If you already
have an existing yard fence, it needs to be re-installed and brought up to
code: gates self-clothing and self-latching. The latch needs to be 54" from
the ground.

It is very important to
maintain the grass short on this area to make sure that the gate
self-closes. A great idea is to make a path of rocks and step stones.
|
|
Step 16:
Sprinkler System |
|
Step 17: Landscaping |
|
 |
|
 |
|
Step 18:
Plaster Application (Diamond Brite) |
|
|
 |
|
|
|
Step 19: After the pool is
plastered, we immediately fill the pool up. |
|
Step 20: Pool Fire-up |
|
 |
|
Coming Soon! |
|
Step 21: Your swimming pool
finished.
|
|
HAVE FUN WITH YOUR FAMILY &
FRIENDS! |
|

Our Field Supervisor will soon
meet with you to give you a Pool Orientation. |
|
 |