Step 1: Lay Out Pool  (1)

Step 2: Dig Pool

 
Step 3: Steel the Pool    After this step is completed, we schedule inspections before going to the next step.
 

Step 4 : Shotcrete Pool (1)

Shotcrete Pool (2)

 

Step 5:  Pool Backfill

 

 

After this step is completed, job will be ready for

Brick & Tile installation.

 

 

Step 6: Brick & Tile Installation

 

After this step is completed, job will be ready for

Plumbing.

   

 Step 7:  Plumbing Installation

 

After the plumbing is completed, we schedule inspection before going to the next steps: Rough Electrical and Deck Grade.

 

 

Step 8:  Form the deck

 

After the Rough Electric is done, all pipes will be covered, then, the deck will be formed ,and inspections will be scheduled.

After the inspections passed, the concrete will be poured and the topping done.

   

Coming Soon!

 Step 9:  Concrete to be poured.

 

   

 Step10:  Finish the Deck with Topping   -  "Cool Deck Topping"

 

    "Euro-Tile Topping"

 

Florida Stones

"Paver Topping"

 

"Paver Topping"

"Marble over sand"

 

Step 11: Equipment installation (Pump, Filter, Heater,  Salt Chlorinator)

 

After this step is completed, the electrician will be scheduled to do the Final Electrical Hook-up.

After the electrical work is completed, we schedule an Electrical Inspection if required to be done before pool is completed.

Some Cities and/or Counties require this inspection to be done after the  pool is finish and the pool equipment is running.

 

 

 Step 12: Pool Barrier   -   Screen Enclosure 

 

 

 After the installation is completed  is completed, the Screen Company schedule inspections.

 

 Step 13:  Pool Plaster Preparation 

 Step 14:  Final Clean up and Grade

 

Coming Soon!

 

  Coming Soon!

 Step 15: Pool Barrier

 New Yard Fence Installation  -  Coming Soon!

After this step  is completed, the Fence Company schedule  inspections.

 

 

 

NOTE: If you already have an existing yard fence, it needs to be re-installed and brought up to code: gates self-clothing and self-latching. The latch needs to be 54" from the ground.

It is very important to maintain the grass short on this area to make sure that the gate self-closes. A great idea is to  make a path of  rocks and step stones.

 

Step 16: Sprinkler System

Step 17:  Landscaping

 

 Step 18:  Plaster Application (Diamond Brite)

   

Step 19: After the pool is plastered, we immediately fill the pool up.

 

Step 20: Pool Fire-up

 

Coming Soon!

Step 21: Your swimming pool finished.

HAVE FUN WITH YOUR FAMILY & FRIENDS!

 

 

Our Field Supervisor will soon meet with you to give you a Pool Orientation.

 

Home Location & Services News New Beadcrete DREAMS Family Fun 07/08 Pools 2006 New Pools 07/08 Pools & Spas Pools Only Spas  Only REMODELS 07/08 DECKS Mosaics Water Features Rock Waterfalls Sheer Descents Construction Steps

Send mail to swimbyike@aol.com with questions or comments about this web site.
Copyright © 2007 Swimming Pools By Ike Jr. Inc.
Last modified: 11/20/07